CLIN 0001–0005 · Catalog
Revised November 2026Tools
18 tools are planned and none is live yet. Each has a page that says what it will do and which regulation it is built from. Until a tool ships, the guides cover the same ground by hand. Want one sooner, or one that is not listed? Ask for it.
- Status 1PlannedThe job and the public source are written down. No code yet. Requests decide what is built first.
- Status 2In developmentBeing built in its own open-source repository, from the regulation and nothing else.
- Status 3LiveIt works in the browser, offline, with its sources cited. The name links to the tool.
18 of 18 tools
CLIN 0001Pricing & cost accounting
Labor rates, indirect rates and price tables that hold up under FAR Part 31.
Wrap Rate Calculator
Build a fully burdened labor rate from base pay, fringe, overhead, G&A and fee.
Built from: FAR Part 31, “Contract Cost Principles and Procedures”
Planned
Indirect Rate Estimator
Turn your cost pools and allocation bases into fringe, overhead and G&A rates.
Built from: FAR Part 31, especially 31.201-2, 31.202 and 31.203, and 2 more
Planned
Section B Pricing Table Builder
Lay out CLINs, quantities and extended prices the way the solicitation asks for them.
Built from: The solicitation’s own Section B and pricing instructions, and 1 more
Planned
Prompt Payment Interest Tracker
Work out the interest owed on a late government invoice under the Prompt Payment Act.
Built from: Prompt Payment Act, 31 U.S.C. Chapter 39, and 3 more
Planned
CLIN 0002Proposal & capture
Take a solicitation apart and prove your response answers all of it.
RFP Requirement Shredder
Pull every “shall”, “must” and “will” out of a solicitation into a numbered requirements list.
Built from: The solicitation itself, and 1 more
Planned
Compliance Matrix Generator
Map Section L instructions and Section M criteria to the proposal sections that answer them.
Built from: The solicitation’s Sections L, M and C, and 1 more
Planned
Acronym Table Builder
Find every acronym in a draft and produce the definition table reviewers expect.
Built from: The solicitation’s own instructions on acronym lists and page counts
Planned
Page Budget Planner
Split a page limit across volumes and sections by evaluation weight.
Built from: The solicitation’s Sections L and M, and 1 more
Planned
CLIN 0003Cybersecurity & compliance
NIST SP 800-171, CMMC and CUI handling, worked through one requirement at a time.
NIST SP 800-171 / CMMC Readiness Checklist
Walk the requirements one by one, track what is implemented and see where you stand before an assessment.
Built from: NIST SP 800-171 Revision 2 and SP 800-171A, and 2 more
Planned
CUI Marking Generator
Produce banner lines and designation indicator blocks for controlled unclassified information.
Built from: CUI rule, 32 CFR Part 2002, and 2 more
Planned
DISA STIG Reference Lookup
Search STIG rules by ID, severity or keyword without leaving the browser.
Built from: DISA Security Technical Implementation Guides and Security Requirements Guides, and 1 more
Planned
OSCAL Validator
Check OSCAL catalogs, profiles and system security plans against the schema, locally.
Built from: NIST, the OSCAL models and schemas
Planned
CLIN 0004Market research & small business
Find the right codes, the right set-asides and the status you already qualify for.
NAICS-to-PSC Crosswalk
Go from an industry code to the product and service codes buyers search on.
Built from: U.S. Census Bureau, North American Industry Classification System, and 2 more
Planned
NDC Eligibility Checker
Check whether you count as a nontraditional defense contractor, and what that opens up.
Built from: 10 U.S.C. 3014, “Nontraditional defense contractor”, and 2 more
Planned
Small Business Set-Aside Guide
See which set-aside programs you may qualify for and what each one requires.
Built from: Small business size regulations, 13 CFR Part 121, and 3 more
Planned
CLIN 0005Tactical & DevSecOps
Utilities for disconnected networks, where nothing can phone home.
Offline Manifest Inspector
Read container manifests, package lockfiles and SBOMs with no network connection.
Built from: The Open Container Initiative image specification, and 2 more
Planned
Certificate Verifier
Decode X.509 certificates and check chains and expiry dates on your own machine.
Built from: RFC 5280, the X.509 certificate and certificate revocation list profile
Planned
Air-Gap Transfer Helpers
Checksums and transfer manifests for moving files onto a disconnected system.
Built from: NIST FIPS 180-4, “Secure Hash Standard”
Planned